Rethink College Park

Helping imagine a great college town for a great university
  • Home
  • About
  • Library
  • Development Map/Projects by Numbers
  • Contribute
  • Categories
    • Businesses
    • Community Events
    • East Campus
    • Economic Development Update
    • Environment
    • Events
    • General College Park
      • College Park Airport
      • Downtown
      • Hollywood
      • Knox Box Redevelopment
      • Northgate Area
      • Old Town
        • Historic District
      • Route 1
    • Greenbelt
    • Housing
    • Hyattsville
    • On Campus Development
    • Other College Towns
    • Politics
    • Projects
      • 2007 Solar House
      • Byrd Stadium
      • Cafritz Property
      • Camden College Park
      • City Garage/Condos/City Hall
      • College Perk Redevelopment
      • Commerce Bank
      • Commons 7 and 8
      • Domain at College Park
      • EYA Arts District Hyattsville
      • Golub Property
      • Greenbelt Station
      • Hilton Hotel
      • Hollywood Station
      • Ikea
      • Jefferson Square
      • Knight Hall Journalism Building
      • M Square Research Park
      • Mazza Grandmarc
      • Mosaic at Turtle Creek
      • NOAA Building
      • Northgate Condominiums
      • Northgate Park
      • Oakland Hall
      • PDC Campfire Condominiums
      • Physical Sciences Complex
      • Poole Property
      • Raymond Towers
      • Starview Plaza
      • The Jefferson
      • The Varsity
      • University View
      • University View Overlook
      • Van Munching Hall Expansion
    • Site Announcements
    • Speculation
    • Transportation
      • Bicycles
      • Connector Road
      • Purple Line
    • Uncategorized
  • Development Projects
    • No categories
  • Subscribe via RSS

UMD Updates Facilities Master Plan

February 9th, 2008  |  by Rob Goodspeed  |  Published in On Campus Development, Purple Line

The UMD administration has completed an “update” to the Facilities Master Plan that reflects changes since the original plan was approved nearly seven years ago. It includes a re-affirmation of many of the original plan’s goals, changes to construction timelines, and tables summarizing changes to campus facilities that have taken place since the 2000 Master Plan. The update also includes updates on the progress of the East Campus Redevelopment Initiative.

The only specific mention the update contains relating to the Purple Line is this text:

“Maximize use of alternatives to driving to campus.”

“Support Purple Line stations on or adjacent to campus consistent with providing central pedestrian movement.”

However, attendees at the recent East Campus Community Review Steering Committee received much different information relating to the Purple Line. Last week, Associate Vice President for Facilities Management J. Frank Brewer gave this presentation containing this illustration overlaying the administration’s preferred Purple Line alignment over the Master Plan map.

Jan28 Presentation Master Plan Illustration

We have several reactions:

1. Is this part of the Master Plan update? If so, it should be included on the official version on the Facilities Master Plan website. If it is not, it should not be presented as such to the public.
2. The map omits the two other alignments under official consideration, making it not a planning document but an argument for one option.
3. The plan presents incomplete and inaccurate information annotated on top of the official master plan map. It includes “2,000 units” at the Knox Box area despite the fact the property remains fragmented in different owners and no specific proposal has been made. Even if the owner of much of the land wants to redevelop it, acquisition, design, and approvals would take perhaps a decade. There is a similar situation for a parcel labeled “600″ across from the Architecture Building, no specific proposal has actually been made. It also only includes numbers for housing, not the extensive office and classroom space planned by the university along a new mall.
4. Despite the distortions and omissions above, the irony is the illustration still seems to support a campus drive alignment anyway! If you imagine a Stamp Union station, the 10-minute walking circles would encompass not only the proposed new housing, but also the substantial amount of existing housing on North Campus and excellent access to planned construction there and elsewhere. The university’s plan presents a walking radius that spills over into low density cul-de-sacs to the south.

Related Posts with Thumbnails
Share and Enjoy:
  • email
  • Print
  • Facebook
  • Twitter
  • Digg
  • del.icio.us
  • Google Bookmarks
  • Reddit
  • StumbleUpon

Leave a Response

Who’s Talking?

  • calvert hills on Turning the Page – Critical Sept. 14th Local Primaries
  • David Daddio on Prince George’s County Council Election
  • Undergrad 2 on Mazza Grandmarc NOW OPEN
  • Grump on Best Buy & The Original Ledo’s Opening Soon
  • Chris Coraggio on UMD/CP Jump on the Bikesharing Bandwagon (again)

Pages

  • About
    • Contact Us
    • Finances
    • Staff
  • Contribute
  • Development Map/Projects by Numbers
  • Library
    • “Knox Box” Development District
    • 2006 Student Charrette
    • Campus Connector Road
    • Campus Master Plan
    • East Campus Redevelopment Initiative
    • M-Square
    • North Gate Development District
    • Old Town Historic District
    • Purple Line
    • Route 1 Corridor Sector Plan

Calendar

Know an event that should be posted? Contact us about it.

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
eXTReMe Tracker







Categories & Projects

Archives


Connect With Us on Facebook

Subscribe to Our Announcements

Email:
Browse Archives at groups.google.com

Follow Us on Twitter


©2010 Rethink College Park
Powered by WordPress using the Gridline Lite theme by Graph Paper Press.