Rethink College Park

Helping imagine a great college town for a great university
  • Home
  • About
  • Library
  • Development Map/Projects by Numbers
  • Contribute
  • Categories
    • Businesses
    • Community Events
    • East Campus
    • Economic Development Update
    • Environment
    • Events
    • General College Park
      • College Park Airport
      • Downtown
      • Hollywood
      • Knox Box Redevelopment
      • Northgate Area
      • Old Town
        • Historic District
      • Route 1
    • Greenbelt
    • Housing
    • Hyattsville
    • On Campus Development
    • Other College Towns
    • Politics
    • Projects
      • 2007 Solar House
      • Byrd Stadium
      • Cafritz Property
      • Camden College Park
      • City Garage/Condos/City Hall
      • College Perk Redevelopment
      • Commerce Bank
      • Commons 7 and 8
      • Domain at College Park
      • EYA Arts District Hyattsville
      • Golub Property
      • Greenbelt Station
      • Hilton Hotel
      • Hollywood Station
      • Ikea
      • Jefferson Square
      • Knight Hall Journalism Building
      • M Square Research Park
      • Mazza Grandmarc
      • Mosaic at Turtle Creek
      • NOAA Building
      • Northgate Condominiums
      • Northgate Park
      • Oakland Hall
      • PDC Campfire Condominiums
      • Physical Sciences Complex
      • Poole Property
      • Raymond Towers
      • Starview Plaza
      • The Jefferson
      • The Varsity
      • University View
      • University View Overlook
      • Van Munching Hall Expansion
    • Site Announcements
    • Speculation
    • Transportation
      • Bicycles
      • Connector Road
      • Purple Line
    • Uncategorized
  • Development Projects
    • No categories
  • Subscribe via RSS

BREAKING NEWS: East Campus Developer FP/Argo is Out

November 14th, 2009  |  by Clay Gump  |  Published in East Campus  |  1 Comment

[flickr]483234201[/flickr]

On Friday the University announced the shocking news that they have ended the relationship with the primary developer for the East Campus project Folger-Pratt/Argo.

This is a considerable setback for the 38-acre project that was billed as the catalyst for a revitalized route 1 and College Park.

Despite best efforts, the current economic downturn and difficult financial and real estate markets preclude an East Campus development on the schedule and scale the parties envisioned.

According to this Washington Post article the economy is forcing the University to break this project into smaller sections.

University spokesman Millree Williams said economic shifts compelled the school to break the project into smaller pieces.

“What we’re trying to do now is find a way to get the development done in chunks, and then finance the chunks,” he said.

Plans are already in place to relocate the facilities currently on the site to other locations on campus.

Not surprisingly the project has been shoved to the back burner since the economic downtown however as recently as July the hope from University officials was still for the project to break ground within 18 months.

In 2007 the prospects for a “Silver Spring” like development for College Park seemed on the fast track. Not only did the University bring on Doug Duncan to spearhead the effort but developer of downtown Silver Spring Folger-Pratt was chosen for the project. Now with both Duncan and FP/Argo gone the future of having the cohesive development College Park so desperately needs is in doubt.

It is not all doom and gloom however. According to the Diamondback Vice President for Administrative Affairs Ann Wylie is still optimistic.

The decision to break ties was a long time coming, Wylie said, and a is “relief” because now the university can begin on the project slowly, without waiting till the market recovers. The university might partner with FP-Argo on some smaller parts of the project.

Related Posts with Thumbnails
Share and Enjoy:
  • email
  • Print
  • Facebook
  • Twitter
  • Digg
  • del.icio.us
  • Google Bookmarks
  • Reddit
  • StumbleUpon

Responses

Feed Trackback Address
  1. calvert hills resident says:

    November 16th, 2009 at 2:08 pm (#)

    Yet another abandoned US Route l project for us all to enjoy. What a shame.

    Like or Dislike: Thumb up 0 Thumb down 0

Leave a Response

Who’s Talking?

  • calvert hills on Turning the Page – Critical Sept. 14th Local Primaries
  • David Daddio on Prince George’s County Council Election
  • Undergrad 2 on Mazza Grandmarc NOW OPEN
  • Grump on Best Buy & The Original Ledo’s Opening Soon
  • Chris Coraggio on UMD/CP Jump on the Bikesharing Bandwagon (again)

Pages

  • About
    • Contact Us
    • Finances
    • Staff
  • Contribute
  • Development Map/Projects by Numbers
  • Library
    • “Knox Box” Development District
    • 2006 Student Charrette
    • Campus Connector Road
    • Campus Master Plan
    • East Campus Redevelopment Initiative
    • M-Square
    • North Gate Development District
    • Old Town Historic District
    • Purple Line
    • Route 1 Corridor Sector Plan

Calendar

Know an event that should be posted? Contact us about it.

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
eXTReMe Tracker







Categories & Projects

Archives


Connect With Us on Facebook

Subscribe to Our Announcements

Email:
Browse Archives at groups.google.com

Follow Us on Twitter


©2010 Rethink College Park
Powered by WordPress using the Gridline Lite theme by Graph Paper Press.